Fukushima Daiichi & Japan

On Friday, March 11, 2011 at 2:46 in tragic incident hit Great East Japan. An earthquake with a magnitude of 9.0 had hit but that wasn’t all. This earthquake was so massive  it gave a rare and complex double quake  that had a severe lasting of three minutes. Following this earthquake was a 15-metre tsunami. This tsunami disabled the power supply and cooling of three Fukushima Daiichi  reactors. Within this tragedy, all three cores of the Fukushima Daiichi reactors melted in the first three days and a total of four reactors were written off because of the incident.

Imagery in the News, EIJournal.com, Earth Imaging Journal, Satellite Images, Remote Sensing

This earthquake and tsunami duo cost plenty of damage to Japan, imaginably so.

  • the tsunami inundated about 560 sq km
  • resulted in human death toll of over 19,00
  • and created  damage to coastal ports and town with over a million buildings destroyed or partially collapsed

Fukushima Plants:

there was the Daiichi and the Daini. The Daiichi was built at 3.1 based on assessments from the Chile tsunami and revisions made in 2002, but unfortunately after this accident it was under some 5 meters of seawater. The Daiichi was the most affected. The earthquake itself didn’t cause any harm to the reactors, in fact he operating units 1-3 were shut down because of it.

BWR 3

“When the power failed at 3.42 pm, about one hour after shutdown of the fission reactions, the reactor cores would still be producing about 1.5% of their nominal thermal power, from fission product decay”. From the moment the tsunami hit, till the days after things went downhill. world-nuclear.org has a wonderful chart explain what shut down and and what time it happened.

Event sequence following earthquake (timing from it: 14:46, 11 March)

Unit 1 Unit 2 Unit 3
Loss of AC power + 51 min + 54 min + 52 min
Loss of cooling + 1 hour + 70 hours + 36 hours
Water level down to top of fuel* + 3 hours + 74 hours + 42 hours
Core damage starts* + 4 hours + 77 hours + 44 hours
Reactor pressure vessel damage* +11 hours uncertain uncertain
Fire pumps with fresh water + 15 hours + 43 hours
Hydrogen explosion (not confirmed for unit 2) + 25 hours
service floor
+ 87 hours
suppression chamber
+ 68 hours
service floor
Fire pumps with seawater + 28 hours + 77 hours + 46 hours
Off-site electrical supply + 11-15 days
Fresh water cooling + 14-15 days

* according to 2012 MAAP analysis

There was so much damage because of this such as fuel ponds and radioactive that was released into air. Due to this people where evacuated from the zone, that by March 12th was extended to 20 km from the plant.

Damages from this disaster lasted till December of that year.

Japan’s New Strategy:

Although there was a promise made by a previous government, approved was a strategy first proposed by the government of Prime Minister Shinzo Abe. “This plan summarizes Japan’s challenges of policies to be tackled, and its lines of long-term, comprehensive and systematic energy policy”. Since this accident there has been an immense amount of things done to prevent an incident of this magnitude to happen again. The radioactive in the water has been recorded stable as of 2015.

 

 

References:

  • http://www.world-nuclear.org/info/safety-and-security/safety-of-plants/fukushima-accident/
  • http://www.nytimes.com/2014/04/12/world/asia/japan-new-energy-strategy-approved.html?_r=0
  • http://www.enecho.meti.go.jp/en/category/others/basic_plan/pdf/4th_strategic_energy_plan.pdf

Leave a Reply

Your email address will not be published. Required fields are marked *